- Location
- Covington, Va
Reached out to a couple manufacturers.
This was Yukon's reply:
This was Yukon's reply:
We do not do 1 off shafts, minimum production run of an axle shaft is 200 units per part#
I show we have logged 2 other requests for that part# in the last 5 years, so it is not some thing that would be considered a viable product at this time due to the lack of return on investment.
There are companies that do offer services to produce 1 off hardened shafts, such as mossier, dutchman, strange etc. at this point that would be about the only option I could recommend.
I have logged the request, so if we do see an uptick in demand it might get produced