Holy shiat! That's ufcking dope! Nice job!
Thanks Prime! I'm really proud of it. Saved about 3k doing it ourselves.
If that doesn't get you some quality time nothing will. How long did it take?
We started the clearing back in September. I laid the patio in October. That took two weekends, and 400 pavers, with 4 trips to Lowe's. Plus two yards of sand.
Built the vegetable boxes out of 2x12 cedar. That took a day.
Laid the landscape fabric last weekend, and went a got a yard of garden soil.
Had 4 yards of gravel delivered yesterday, and went and got 1/2 a yard of compost today. Then about $200 worth of starter vegetables.
Huge transformation from last year.
On another note, I'm having a 2013 pro-4x with 70k transferred to carmax nearby for a test drive.