Hello electronically savvy folks! I have a few questions about the installation procedure for a new CB I received as a gift. I've read through about as much as I can but I need some more direct Xterra specific advice. Here is the CB I have...
Nissan Xterra/Frontier Rear Recovery Point Installation Instructions Gen I (2000-2004)
Time Required: 60-120 minutes Difficulty: 4.5/10
Tools Required:
Jack
Center punch
Jack Stand
hammer
Wheel chocks
Drill with ¼”...
Nissan Xterra/Frontier Gen II Slider Installation Instructions
These instructions can be printed from our support page here:
http://engineeringpp.com/support.html
Time Required: 30-60 mins Difficulty: 3.5/10
Tools Required:
Torque Wrench ~150ft-lb capacity
(2) Jack Stands...