Nissan Xterra/Frontier Rear Recovery Point Installation Instructions Gen I (2000-2004)
Time Required: 60-120 minutes Difficulty: 4.5/10
Tools Required:
Jack
Center punch
Jack Stand
hammer
Wheel chocks
Drill with ¼”...
Nissan Xterra/Frontier Gen II Slider Installation Instructions
These instructions can be printed from our support page here:
http://engineeringpp.com/support.html
Time Required: 30-60 mins Difficulty: 3.5/10
Tools Required:
Torque Wrench ~150ft-lb capacity
(2) Jack Stands...
Group buy is CLOSED! Thank you to all who ordered. We had a very strong response. Between locals and forum members have made over 20 pairs of sliders and numerous process and product improvements.
With each new product we will be partnering with XterraNation.org to offer a pre-release...